Go to whole of WA Government search

×

Warning

JUser: :_load: Unable to load user with ID: 733

  • L8659/2012/3
  • Decision

    Decision Report - Granted 25 November 2024

    Historical Risk Assessments - 12 November 201531 March 2017 & 21 September 2020

  • Type Licence
  • Holder CITIC Pacific Mining Management Pty Ltd
  • Premises name Sino Iron Project Transhipment Facility
  • Location details Within the coordinates: Point 1: 116o 4’ 59.88” E, 20o 39’ 50.39” S Point 2: 116o 15’ 0.00” E, 20o 35’ 52.55” S Point 3: 116o 15’ 0.00” E, 20o 45’ 0.00” S Point 4: 116o 14’ 0.00” E, 20o 45’ 0.00” S Point 5: 116o 14’ 0.00” E, 20o 45’ 41.37” S Point 6: 116o 9’ 31.34” E, 20o 47’ 44.48” S Point 7: 116o 9’ 32.93” E, 20o 42’ 56.89” S Point 8: 116o 5’ 34.95” E, 20o 44’ 30.00” S Point 9: 116o 4’ 59.88” E, 20o 42’ 59.76” S
  • Suburb MARDIE WA 6714
  • Local Government Karratha City
  • Date issued 2024-11-25
  • Date commenced 2024-11-26
  • Date of expiry 2044-11-25
  • Category
    58 - Bulk material loading or unloading
    73 - Bulk storage of chemicals etc.
  • Comment Appeal period commences 26 November 2024